Ottine Mineral Springs Spa Corten Metal Roof Restoration
Ja-Mar Roofing & Sheet Metal initially became involved at Ottine Mineral Springs Spa for a much smaller scope of work. The original plan called for pressure washing the existing tile roof and installing several new canopies, but further investigation showed that the condition of the roofing required a much broader solution.
The property had more than 75 years of Ludowici clay tile roofing in place. What first appeared to be a significant tile-repair project ultimately became a full reroof after our inspection revealed the extent of the deterioration. That changed the project from a straightforward repair into a larger design-build effort that required the owner, general contractor and roofing team to evaluate several replacement options before settling on the final system.
Different materials were considered, including prefinished metal in a terra-cotta color. The final design paired a 22-gauge standing seam metal roofing system with a COR-TEN weathered steel finish, giving the property a distinctive appearance that worked with the character of the existing structures. Corrugated Corten panels were also selected for the new canopies.
The project combined several roofing systems across approximately 40,000 square feet. In addition to the 22-gauge ShurLoc 550 engineered standing seam roof and corrugated canopy panels, Ja-Mar installed a fully adhered 60-mil TPO roofing system with tapered insulation and a 24-gauge, 7-inch seamless commercial box gutter system. Coordinating those materials and transitions was an important part of delivering the property as one complete roofing project.
Once demolition began, the team uncovered another challenge: more than 500 square feet of deteriorated roof decking beneath the old tile. The existing decking material was no longer manufactured, so replacing it required a custom solution rather than an off-the-shelf product. Our crew cut new decking from 4x6 material to recreate what was needed and provide a solid substrate for the new roofing assembly.
Schedule was just as important as the technical work. Ja-Mar was allotted 30 days to complete the metal roofing portion of the project. Cold weather and rain created additional delays, while the unexpected decking repairs added work that could not have been fully anticipated before tear-off.
Despite those conditions, the roofing work was completed within the required schedule and ahead of the other trades on the project. The finished roof replaced an aging clay tile system with a combination of modern low-slope roofing and architectural Corten metal while maintaining a look that suited the property.
For Ja-Mar, the project became a strong example of the type of work that can develop when an initial repair turns into a much larger historic roofing restoration. Careful investigation, custom fabrication, field problem-solving and coordination with Sabre Commercial allowed the team to adapt the scope without losing sight of the project schedule or architectural intent.
Have a Roofing Project in Mind?
Get a free, no-obligation roof inspection from a local Ja-Mar Roofing consultant.